Short Company profile

Patkonsult 2000 SPLTD - Sofia


Contacts

Sofia, 1505
63 Cherkovna St., fl. 7, apt. 35
phone: 02/9585849,9586484
fax: 02/9586477
e-mail: s.nikolova@patconsult.net
WEB-site: http://www.patconsult.net
 

Company Figures


BULSTAT: 130086390
VAT No: BG130086390
Reg No: 11180/99
No of employees: 15 (2025)
Profit/Loss (thous. BGN): 78 (2025)
Total revenue (thous. BGN): 996 (2025)
Fixed Assets (thous. BGN): 6 (2025)
Capital (BGN): 5 000
 
 
 

Branch: Engineering activities and related technical consultancy
Registered Actitity: Construction and designing Supervision /after permission/
 

04.11.2013

19 kilometers of an important road in Tervel municipality renovated under OPRD Renovation and reconstruction of 19 kilometers of road III-7102 Road Fork ²²-71 (Kolartsi) - Mali izvor-Tervel from kilometer 0+000 to kilometer 19+032.31 in Dobrich region has started. The project is included in Lot 44 of the fourth stage of Operational programme Regional Development 2007-2013, co-funded by the European fund for regional development and the state budget. The site was presented at a press-conference, held in Dobrich by Engineer Tanya Kokosharova, director of the project, Agency Road Infrastructure. The section is located at the territory of Tervel municipality. It is a main connection of the villages in the region with municipal center of Tervel, as well as the most direct road to Krushari municipality. It ensures link to cities of Varna and Dobrich. Patperfect T SPJSC is subcontractor of construction and installation work. Construction supervision will be made by Patkonsult 2000 SPLTD. Construction contract is concluded for BGN 9. 299 million, VAT excluded, while construction supervision is set in a contract for BGN 198 677 VAT excluded. The site will be repaired, road construction will be renovated; basic, countervailing and wear asphalt layers will be laid, as well. New lined trenches, banquets and concrete curbs will be made. Replacement of steel guardrail and upgrade of horizontal marks are also envisaged in the project. It is the third road project on the territory of the region, funded under Operational programme Regional development. With money under the program nearly 16 kilometers of Road ²²-29 (Å-70) Dobrich - General Toshevo - Kardam - Romanian border - Lot 6 and about 18 kilometers Border with Regional Road Department Varna (Cherventsi) - Vladimirovo from km 42 +431 to km 49 +419 and from road III-2077 -Chestimensko Kableshkovo - Border RRD Silistra (Mejden) from km 0 +000 to km 11 +000 - Lot 52 are renovated

Agency Road Infrastructure - Sofia Chamber of Professional Valuers - Sofia IG Holding Patengineeringstroy T SPJSC - Targovishte Patkonsult 2000 SPLTD - Sofia Patperfect T SPJSC - Silistra 
 


News

  page 1 / 2   page    
12.10.2026: The Road Infrastructure Agency (RIA) announced that it is...
01.07.2020: There are eight candidates for supervision of the construction...
26.10.2016: 8 companies bid for the supervision of the construction of 16...
27.04.2016: Brussels backs construction of Sofia subway third line with EUR...
22.10.2015: Bulgaria awards 52.2 mln euro contract for construction of Sofia...
04.11.2013: 19 kilometers of an important road in Tervel municipality...
15.04.2013: Bulgaria’s Road Infrastructure Agency said on Friday it received...
02.03.2011: 10 bids submitted for the supervision of Lot 2 of Maritsa...
21.12.2009: Stara Zagora attracts investors in a new industrial...
18.12.2009: New industrial zone to be developed in Stara...
 
This company profile is visited 1 053 times
[2026: 124, 2025: 238, 2024: 99, ... ]