Short Company profile

Bulgartransgaz SPJSC - Sofia


Contacts

Sofia, 1336
Lyulin 2, 66 Pancho Vladigerov Str.
phone: 02/9396200,9396300,9396305
fax: 02/9250063
e-mail: info@bulgartransgaz.bg
WEB-site: http://www.bulgartransgaz.bg
 

Company Figures


BULSTAT: 175203478
VAT No: BG175203478
Reg No: 16439/2006
No of employees: 965 (2023)
Profit/Loss (thous. BGN): 283 450 (2022)
Total revenue (thous. BGN): 1 149 428 (2022)
Fixed Assets (thous. BGN): 7 907 920 (2022)
Capital (BGN): 1 614 786 264
 
 
 

Branch: Transport via pipelines
Licences & Certificates:  Allocation of electricity Large taxpayers and insurers Transfer of natural gas
Membership: Bulgarian Industrial Association
Registered Actitity: Preservation, transit transport and transport of natural gas; maintenance, exploitation, management and development of underground gas storage; development of programs and activities for correspondence of the gas-transport activity to the EU requirements; development of price policy for joining, transport and preservation of natural gas, according to the current legislation, administration of the deals with natural gas and organization of the balance on the market of natural gas; engineering, investment, manufacture and service activity; import of goods, machines and equipment, related to the companys activity; operative management of the gas-transport system.
 

21.05.2024

"Bulgartransgaz" announced the winners who will build the vertical gas corridor The state gas distribution company "Bulgartransgaz" announced the results of the announced public procurement in connection with the implementation of the vertical gas corridor through the construction and commissioning of new sites for the expansion of the gas transmission infrastructure in Bulgaria. The project aims to increase the natural gas transmission capacity at the interconnection points Kulata/Sidirokastro in the direction from Greece to Bulgaria and Negru Voda/Kardam in the direction from Bulgaria to Romania. The public procurement is in three separate positions with a total estimated value of BGN 586,669,410 excluding VAT. The following were ranked in first place: for the "Looping from the Tower to Kresna" site - "HIL International - GBS 1" (with a proposed price of BGN 131,777,777 excluding VAT); for the project "Transmission gas pipeline from Piperevo to Pernik" - "Negru voda Kardam 2024" (with a price of nearly BGN 100 million without VAT).; for the object "Looping from Rupcha to Vetrino" - "HIL International - GBS 3" (BGN 353,222,222 without VAT). "HIL International - GBS 1" is a union of two foreign and three Bulgarian companies, and the following participate in it: the American "HIL International N.V.", the Bulgarian "Glavbolgarstroy", "Glavbolgarstroy International", "GBS Energy Solutions" and the American " GBS Technologies". The subcontractors declared by the association are: "CERC - Evans" B.V., "Emerson Automation Solutions", "Honeywell" and "Ensol VM". "Negru Voda Kardam 2024" is a union of two foreign and one Bulgarian company, whose members are the American "Divicom", the Romanian "Habau" and the Bulgarian SAIE. The subcontractors declared by the association are "Ensol VM" and "Khimkomplekt Engineering". "HIL International - GBS 3" is a merger of "HIL International N.V.", "Glavbolgarstroy", "Glavbolgarstroy International", "GBS Energy Solutions" and "GBS Technologies Inc". The subcontractors declared by the association are: "CERC - Evans", "Emerson Automation Solutions", "Honeywell" and "Ensol VM".

Bulgartransgaz SPJSC - Sofia Chimcomplect Engineering JSC - Sofia GBS Energy Solutions Glavbolgarstroy International JSC - Sofia Glavbolgarstroy JSC - Sofia Honeywell SPLTD - Sofia SA.I.E Ltd 
 


News

  page 1 / 52   page    
18.07.2024: IMF: State-owned companies in Bulgaria are expensive,...
05.07.2024: The official cabinet approved the withdrawal of an investment...
21.05.2024: "Bulgartransgaz" announced the winners who will build the...
10.05.2024: The ceramic plate factory "Keros Keramika" EAD in the eastern...
10.05.2024: The profit of "Bulgartransgaz" for 2023 decreases to BGN 210...
16.04.2024: A project for the gasification of the Mariska Basin...
11.04.2024: "Bulgartransgaz" has a new executive director Kiril Ravnachki...
03.04.2024: The revenues from "Turkish Stream" through Bulgaria are half of...
21.03.2024: "Bulgartransgaz" begins work on a vertical gas corridor The...
20.02.2024: Gas in March cheaper by 13%. Azeri supplies and from Revitusa,...
 
This company profile is visited 7 598 times
[2024: 722, ... ]