Short Company profile

AB JSC - Haskovo


Contacts

Haskovo, 6300
38, Saedinenie Blvd, POBox 48
phone: 038/664399,664637,662191,624637
fax: 038/664399
e-mail: office@abad.bg
 

Company Figures


BULSTAT: 836014515
VAT No: BG836014515
Reg No: 90/93
No of employees: 317 (2025)
Profit/Loss (thous. BGN): 9 576 (2024)
Total revenue (thous. BGN): 59 767 (2024)
Fixed Assets (thous. BGN): 16 627 (2024)
Capital (BGN): 5 000 000
 
 
 

Branch: Manufacture of other non-metallic mineral products n.e.c.
Licences & Certificates:  Certificate ISO 14001 Certificate ISO 9001 Certificate OHSAS 18001 Registered building company
Membership: Bulgarian Industrial Association
General Meetings: Last - 29.11.2013 
Registered Actitity: Road construction, repair and maintenance, manufacture of building materials, scientific research, planning, investment, engineering, commerce in the country and abroad, transportation of passengers and freights, commercial representation and mediation, shipping, transportation, management of real estates.
 

30.06.2010

Trakia IV association places a BGN 174.7 mln bid for Lot 4 of Trakia motorway Trakia IV association has placed the lowest bid BGN 174.705 mln, excluding VAT, for the construction of Lot 4 of the Trakia motorway - the section from Yambol to Karnobat. The association includes the companies Holding Roads, Galchev Engineering Group, Road Construction Equipment - Sofia, Road Engineering PLC - Montana, AB JSC - Haskovo, Road Construction - Burgas, Road Construction - Targovishte, Bridge Construction Sofia and Vida Road Construction PLC. If this bidder is selected to build the motorway, one kilometre of the 47.7-km-long section will cost some BGN 3.6 mln (1.8 mln), excluding VAT. For comparison, the Greek company Aktor won the tender for the construction of Trakia's Lot 3 with a bid of BGN 3.8 mln/km, and Magistrala Trace demanded BGN 4.4 mln/km for the the section from Stara Zagora to Nova Zagora of the same motorway, while the price foreseen by the contracting authority was about BGN 6 mln. Out of the 13 bids filed for the tender, only 6 were admitted and opened yesterday. The second lowest offer was submitted by the partnership between Bulgaria's Balkanstroy and Macedonia's Granite, which demanded BGN 198.38 mln. Minister of Regional Development and Public Works Rosen Plevneliev added that the procedure for selecting a contractor for Lot 3 had been concluded without an appeal against it. A contract with Aktor is expected to be signed next week.

AB JSC - Haskovo Ministry of Regional Development and Public Works - Sofia Patengineeringstroy T SPJSC - Targovishte PST Grup SPJSC - Sofia Strabag SPJSC - Sofia Trace Group Hold JSC - Sofia Trakia Motorway JSC - Sofia 
 


News

  page 1 / 5   page    
18.02.2026: The resigned cabinet has pushed the assessment for investments...
13.12.2024: In October, the Road Infrastructure Agency (RIA) announced the...
23.12.2022: The "Road Infrastructure" Agency (API) directly assigns, without...
01.07.2022: DNSK fines companies that illegally built Hemus Directorate for...
13.05.2020: A car cable manufacturer received half a million under the 60/40...
03.02.2020: Haskovo-based builder AB will have a new owner Valirion wants...
25.08.2017: After 20 months of blocking the construction of the stretch of...
31.08.2010: Bulgaria's Holding Roads to Sign Contract for Trakiya...
30.06.2010: Trakia IV association places a BGN 174.7 mln bid for Lot 4 of...
30.06.2010: Trakia IV association places a BGN 174.7 mln bid for Lot 4 of...
 
This company profile is visited 4 112 times
[2026: 79, 2025: 544, 2024: 324, ... ]